Ever Spark TechnologiesEver Spark Technologies
HomeAbout UsServicesProjectsBlogsContact Us
Ever Spark TechnologiesEver Spark Technologies

Leading provider of electrochlorination, solar, and water disinfection solutions.

Quick Links

  • About Us
  • Products
  • Services
  • Projects
  • Blogs
  • Contact

Contact Info

Meneharya sub city, Guwi stadium Kebele, Near lake side school Hawassa, Ethiopia

+251916010473/+251919403565

abdisa@eversparktech.com

© 2026 Ever Spark Technologies. All rights reserved.

Privacy PolicyTerms of Service
Installation and commisioning of Clara Plus system in Yabdo Gojela kebele
Water Treatment

Installation and commisioning of Clara Plus system in Yabdo Gojela kebele

Yabdo Gojela Kebele, Ciroo Woreda, West Hararge, Oromia
Client: CRS, ECCSDOH
Completed: 2025
Rating:
4/5
Executive Summary

Access to safe water is a fundamental right, yet many communities continue to struggle with waterborne diseases and inconsistent supply. The Yabdo Gojela installation project represents a paradigm shift in rural water management. By integrating the innovative Clara Plus system, we have moved beyond temporary fixes to provide a permanent, self-sustaining water disinfection solution. This project doesn’t just deliver technology; it delivers health, resilience, and operational independence to the West Hararge zone. Through strategic partnership and engineering excellence, we are setting a new standard for sustainable water infrastructure in Ethiopia.

The objective of the project was to provide a sustainable and autonomous water disinfection system for the local community to eliminate waterborne pathogens The project successfully transitioned the site from an untreated source to a fully chlorinated, safe water supply. Beyond the hardware, the initiative included comprehensive user training for local operators, ensuring the community has the skills to manage and maintain their new utility independently. This installation serves as a model for utilizing robust, on-site chlorine generation to overcome the logistical challenges of rural chemical supply chains.

Project Gallery
Project image 1
Project image 2
Project image 3
Project image 4
Key Results
  • System Deployed: Clara Plus Water Disinfection System
  • Production Capacity: 15 liters of high-quality disinfectant produced every 2 hours.
  • Infrastructure: Complete overhaul of the distribution network
  • including the installation of 36 meters of 3-inch GS piping to ensure optimal flow and durability in rocky terrain.
  • Automation: Integrated dosing pump system for precise
  • consistent water treatment